Skip to content

Sustainability

Make every claim traceable

If a client needs diversion or destination records, define the fields and format before the material moves.

Illustrative industry image

Reporting01

Four items to define up front

Use this as a brief. The response should confirm which records are available and in what format.

Diversion report
Define the project, dates, metal streams, weight basis and treatment of residual waste.
Destination & chain of custody
List the movement, destination and docket fields that must connect back to the site or project.
Project references
List the site, cost-code, docket and sign-off fields needed so availability can be checked before the job starts.
Avoided-emissions data
Name the method, factors and review standard. A generic industry comparison may not meet the project requirement.

The journey02

Follow the record to its destination

Each handoff should keep the project reference and explain any change in weight or grade.

  1. 01

    Arrival

    Connect the material, source, project reference, measured quantity and initial grade.
  2. 02

    Sorting

    Record any separation or removal of non-metal material that changes the weight or grade.
  3. 03

    Processing

    State how the material is prepared and how residual material is accounted for.
  4. 04

    Destination

    Identify the receiving facility and retain the movement reference back to the project.

Next step03

Send the reporting brief

Include the required fields, reporting period, file format and reviewer. Availability can then be confirmed before the material moves.

Start an enquiry